JET FUEL LOADING STATIONS

A comprehensive solution replaces aging infrastructure at remote jet fueling stations. This Jet Fuel Loading Station project involved the replacement of aging aircraft refuelling infrastructure in two locations: Lac la Biche and Pincher Creek in Alberta, Canada. Each location had two fueling stations, catering to fixed-wing aircraft and, in Pincher Creek, fixed-wing aircraft and helicopters. […]

NATURAL GAS METERING + SUPPORT BUILDINGS

A turnkey solution that supports power distribution in Northern Alberta. In 2020, a client came to us with a potential collaboration to fulfill their end user’s requirements, a leading power producer as part of the Cascade Power Project located in Yellowhead County, Southwest of Edson. This project involved the construction of two natural gas metering […]

PROPANE TRUCK LOADING METERING + MERCAPATAN INJECTION

In the Spring of 2023, Sky Eye executed a propane truck loading project at a processing facility in Fort Saskatchewan, Alberta. This comprehensive project was executed to efficiently transfer propane from the facility’s storage bullets to trucks, ensuring efficient transfer for further refining and consumer use. The propane loading package showcases exceptional performance, achieving loading […]

ORCA PACIFIC TERMINAL

In early 2021, a new client approached us with a challenge: Transloading Propane from railcars to trucks for distribution across Vancouver Island before a permanent Propanestorage and distribution facility was constructed. The solution began with an 8-month rental Propane Transloader, allowing for testing the new business model and procuring future contracts. This comprehensive site solution is […]

SKY EYE DELIVERS 25 TRANSLOADERS TO THE PERMIAN IN JUST 12 WEEKS

In 2019, a new client, the trading arm of a large producer, recognized an opportunity to manage the offtake of crude production volumes moved via rail to the refineries in California and Louisiana from the Permian. At this time, the cost to ship via existing pipelines was exorbitant, and this arbitrage enabled this client to […]

SKYMOD’s 101: A Discussion with Sky Eye’s President, Richard Hansen

All across North America, Producers are increasingly pressed to find semi-permanent infrastructure options that provide flexibility, minimize capital spends and have lower impacts on their surrounding environments. Sky Eye’s President, Richard Hansen, reflects on the evolution of SKYMOD’s – Sky Eye’s Modular Solutions Packages. Q: Can you tell me what a SKYMOD is?  A: SKYMOD’s are […]

SKYRAK: THE CANADIAN-MADE RAIL-TOP ACCESS SOLUTION

In late 2020, the Sky Eye team was awarded a project to build an Ethanol Railcar Top Offloading solution with a top access platform in Eastern Canada. The Sky Eye team provided a comprehensive SKYRAK solution, including design, complete engineering work and pre-fabrication. The collaborative design wrapped up in May 2021, and the project was […]

HEAVY-OIL TRUCK OFFLOADING TERMINAL: A SKYMOD SOLUTION

In February 2020, Sky Eye was awarded and kicked off front-end engineering design (FEED) for a 975m3/hr Heavy Oil Truck Offloading Terminal for a Western Canadian producer. This project included an overhead piping system, truck offload stations and an on-site operations laboratory. Shortly after the project was awarded, the COVID-19 pandemic hit and this project, […]

A BIO-DIESEL BLENDING SOLUTION MAXIMIZES VERSATILITY

Ultimately, Sky Eye’s solution was to design and build a blending solution that simultaneously removed diesel from the trucks and bio-diesel from the railcars, blending it to create the final product. Sky Eye’s modular solution and rapid delivery times meant that our client’s end user could avoid the cost associated with installing permanent infrastructure on […]

A DUAL GASOLINE AND DIESEL BLENDING AND LOADING SOLUTION

An innovative Sky Eye design provides a simultaneous blending and loading solution. At the beginning of March 2020, a large Energy Producer reached out to the team at Sky Eye for a gasoline blending and diesel transloader solution for their site in Guadalajara, Mexico. The solution was on site by June 2020. The transloader was […]