Can be used with a variety of loading operations including tank trucks, rail tank cars, aircraft refuelers and tanks for an independent ground proving method without overfill prevention to ensure that transport vehicles are properly tied to ground before and during the loading operation.
The ST-47 Static Grounding system continuously monitors the ground connection and if that connection is lost, the ST47 will non-permit.
For static ground verification in conjunction with your Scully Overfill Prevention system, wire the ST-47 through your Overfill Prevention Control Monitor and plug and cable for one quick overfill protection and static grounding/earthing connection.